|
|
|
R & D Study Items
|
|
Next Section
|
R & D Programme - Phase 2
Please refer to the section below for information on each R & D task. Executive summaries of the results are now available. The Phase 2 study reports will shortly available in full on a CD-Rom, together with all the other reports from the initiative. Please contact info@oilandgasuk.co.uk or telephone +44 (0) 20 7802 2400 to request a copy.
Click here for the UKOOA Drill Cuttings Initiative Final Report.
Click here for the Scientific Review Group Final Report.
Study Items: Scope, Deliverables and Results
|
Reference |
Title |
|
Task 1 |
Characterisation of representative cuttings piles
|
|
Task 2a |
Toxicokinetics of water based mud (WBM) drill cuttings contaminants in marine sediment
|
|
Task 2b |
Assessment of the actual present environmental impacts of representative oil based mud (OBM) and water based mud (WBM) cuttings piles
|
|
Task 2c |
Water column and food chain impacts
|
|
Task 3 |
Initiate comparative time series data on factors determining future pile volume from representative oil based mud (OBM) and water based mud (WBM) cuttings piles
|
|
Task 4 |
Adaptation and evaluation of mathematical model
|
|
Task 5a |
In-situ solutions: enhanced bio-remediation
|
|
Task 5b |
In-situ solutions: covering
|
|
Task 6 |
Pilot lifting operation
|
|
Task 7 |
Evaluation of options for the handling of the lifted materials - offshore, transport to shore and onshore processing
|
|
Task 8 |
Comparative assessment: towards BEP/BAT options
|
|
R & D Study Items
|
|
Next Section
|
|